1. Home
  2. Industries
  3. Mining and metals

Mining and metals software · Fleet, safety, production

Mining software for safer, steadier production.

Javixor Labs builds fleet, safety, maintenance, production and plant data systems for mines, smelters and metal processors, with OT security planned from the start.

72business
hrs
Typical start for most roles
48hrsReplacement shortlist if needed
NDASigned before you share details
YoursCode and IP, by contract

Trusted by teams at

Cobra Clicks
Cobra Clicks
Domino's
Domino's
Honeywell
Honeywell
Adani
Adani
Dubai Customs
Dubai Customs
Qatar Duty Free
Qatar Duty Free
Cobra Clicks
Cobra Clicks
Domino's
Domino's
Honeywell
Honeywell
Adani
Adani
Dubai Customs
Dubai Customs
Qatar Duty Free
Qatar Duty Free
40+Projects delivered
10Industries served
8Countries with active clients
90%Clients who renew or extend

Service overview

What mining software really means.

Flip the switch to see what changes for your team, then explore what the service covers.

Mining software covers the systems that help a mine or metals plant run safely and steadily: tracking fleet and equipment, recording safety work, planning maintenance, reporting production and collecting ESG data. It has to work at remote sites with weak signal, respect safety rules and keep plant control systems protected. Javixor Labs builds these systems and the data links between them.

  • Safety recordsPaper forms typed up days laterLogged on site, even offline
  • Haul fleetIdle trucks nobody noticesIdle time flagged during the shift
  • BreakdownsFailures without warningCondition data triggers planned work
  • Tonnes and gradesKnown at shift endVisible from source systems all day
  • Fleet, equipment and cycle tracking
  • HSE apps for incidents, inspections and permits
  • Maintenance planning linked to condition data
  • Production reporting from plant and site systems
  • Offline field apps for remote locations
  • ESG data collection and reporting tools
  • Mining companies running several sites
  • Contractors managing fleets for mine owners
  • Smelters and metal processors with plant data
  • Mining tech startups building new products
  • Safety reporting stuck on paper
  • Costly equipment failures with no warning
  • Production numbers that arrive too late to act
  • Patchy connectivity across spread out sites
  • ESG data gathered by hand for every report

We read data from plant systems by default. Any control function is designed with your operations team through management of change.

Pain points we solve

Problems mining teams bring us.

Most mining projects start with one of these. Here is what we build to fix each one.

Safety reporting on paper

Incidents and inspections recorded by hand.

How we fix itMobile safety reports and trend tracking

Fleet idle time

Trucks and loaders waiting with no one noticing.

How we fix itFleet utilisation and idle tracking

Costly breakdowns

Heavy equipment fails without warning.

How we fix itCondition monitoring and planned work

Production numbers late

Tonnes and grades reported at shift end.

How we fix itDaily production numbers from source systems

Remote sites

Poor connectivity and spread out operations.

How we fix itRead only data collection that works offline

ESG reporting

Emissions, water and community data by hand.

How we fix itAutomatic ESG data collection and reports
Does one of these sound like your week?Talk to us about your project →

What we build

Every kind of mining software.

Take the full build or only the part your team is missing. Scroll, swipe or use the arrows to see them all.

01 / 10

Fleet and equipment tracking

Location, cycle times, queuing and fuel for trucks, loaders and support vehicles. See where time is lost during the shift, not after it.

  • GPS
  • Cycles
  • Idle time
02 / 10

HSE and safety

Incidents, inspections and permits.

  • Incidents
  • Inspections
  • Permits
03 / 10

Maintenance management

Work orders, spares and condition data for heavy equipment in one place. Warnings turn into planned jobs before failures stop production.

  • Work orders
  • Spares
  • Condition data
04 / 10

Production reporting

Tonnes, grades and shifts.

  • Shift reports
  • Grades
  • Targets
06 / 10

Geospatial tools

Pits, stockpiles and drone surveys.

  • GIS
  • Drone data
  • Volumes
Geospatial data →
07 / 10

Field apps

Apps that work with no signal and sync when a connection returns. Built for gloves, dust and bright sunlight at remote sites.

  • Offline
  • Photos
  • Checklists
08 / 10

ESG reporting

Emissions, water and community data.

  • Emissions
  • Water
  • Reports
09 / 10

ERP integration

Production, inventory and maintenance data flowing into your ERP. Cost per tonne is based on real figures, not month end estimates.

  • ERP
  • Costs
  • Inventory
ERP integration →
10 / 10

AI for mining

Predictive maintenance and planning.

  • Predictive
  • Ore grade insights
  • Safety analytics
AI Labs →

Engagement models

Find the model that fits you.

Answer four quick questions and we will highlight the best fit. You can switch models later as your needs change.

01How long do you need help?
02Who should manage the work?
03Is the scope clear?
04Who is the end client?
Best fit

Dedicated mining software team

A team with its own delivery lead that builds and runs fleet, safety or production systems across your sites.

Best fit

IT staff augmentation

Engineers who join your digital or OT team and work to your site rules and change process. No fixed term.

Best fit

Fixed scope pilot

A defined piece of work, such as a safety app at one site, with agreed deliverables and a written estimate.

Best fit

Site systems care plan

A monthly block of time for fixes, updates and small changes to apps and data links already in use.

Best fit

Hourly per specialist

Hours billed against weekly reports, useful for a data audit, an integration check or a short pilot.

Best fit

White label delivery

Mining software delivered under your brand when your consultancy or systems integrator serves mine owners.

Use cases

Where mining teams usually start.

Five common projects, with the things that decide what each one costs.

01

Fleet and equipment tracking

Location, utilisation, fuel and idle time.

What drives the cost
  • Fleet size
  • Devices
  • Connectivity
02

HSE and safety

Incidents, inspections, permits and trends.

What drives the cost
  • Sites
  • Forms
  • Regulator reporting
03

Maintenance management

Work orders, spares and condition data.

What drives the cost
  • Asset count
  • Sensor links
  • Spares rules
04

Production reporting

Tonnage, grade, shifts and costs in one view.

What drives the cost
  • Data sources
  • Reports
  • Users
05

ESG reporting

Collect emissions, water and safety data for reports.

What drives the cost
  • Frameworks
  • Data sources
  • Sign off

Something else in mind?

Tell us the mining problem. We will say plainly whether software is the right fix and what it would involve.

Describe your use case →

Indicative only. Ballpark: $18 to $34 an hour per engineer, about $2,900 to $5,400 a month full time. Cost depends on scope, integrations and team. Every project starts with a written estimate.

Why Javixor Labs

Why teams choose us for mining software.

What you can expect from the first call to the last handover.

Talk to a delivery lead →
  1. 01

    You approve every engineer

    You see profiles and interview each person. Nobody works on your systems without your sign off.

  2. 02

    Fast, dependable starts

    Most engineers start within 72 business hours of a confirmed brief. If someone is not a fit, we send a replacement shortlist in 48 hours.

  3. 03

    Safety comes first

    We plan with your HSE and operations teams, read plant data only by default and follow your management of change.

  4. 04

    Built for remote sites

    Field apps work offline and sync when signal returns, so crews can use them where the work happens.

  5. 05

    Flexible engagement

    Pilots, dedicated teams, retainers or staff augmentation. No fixed term on staff augmentation, and you end it with notice.

  6. 06

    Your data, your systems

    Code, data and integrations live in your accounts, and the contract assigns all IP to you.

Rules and standards

Safety and security, first.

We plan for the rules your systems must follow from the first workshop, not at the end.

What we build to

01

ISO 45001

Occupational health and safety

02

IEC 62443

Industrial system security

03

Mine safety regulations

Inspections and incident records

04

ESG frameworks

Emissions and water reporting

05

Read only by default

No control without sign off

Who we build for

Mining and Metals buyers, different needs.

An enterprise, a growing business and a startup in mining buy software differently. Pick yours to see how we work with you.

For large companies and government

Systems across mines and plants.

Large miners need fleet, safety and production systems across sites. We work to your OT security and management of change.

What matters to you

  • Multi site
  • OT security
  • HSE fit
  • Vendor paperwork
  • Long term support

How we work with you

  • Architecture to your standardsreviewed with your architects
  • Security and compliance firstrules mapped before code
  • Dedicated teamengineers, QA and a delivery lead
  • Contract and NDA firstIP assigned to you
Talk to us about enterprise mining →

How we build

From goal to working mining software.

Clear stages with something you can see and sign off at each one. Hover any stop to see what you get.

Hover or tap any stop to see what happens there

AI in mining

AI for safer, steadier mines.

AI features piloted on real equipment, with people in control.

Mining AI helps most with predictive maintenance on heavy equipment, safety analytics, production forecasting and reading drone and sensor data.

We start from a real problem, pick the model and where it runs based on privacy, cost and accuracy, and measure results before rolling out.

  • A clear use case and success measure first
  • Your data is never used to train public models
  • Human review where decisions matter
See AI Labs →
Predictive maintenanceHeavy equipment
Safety analyticsRisk patterns
Production forecastsShift targets
Drone analysisStockpile volumes
Energy useMills and crushers
Report readingInspections to data
Anomaly alertsUnusual readings
Human reviewSupervisors decide

Security and quality

Security, compliance and quality.

How we protect your systems, your data and your intellectual property.

NDA firstWe sign an NDA before you share site, production or geology details, and every engineer is bound by it.
  1. We sign an NDA before you share site, production or geology details, and every engineer is bound by it.

  2. Plant networks stay separate. Data leaves through approved, one way paths agreed with your OT team.

  3. We collect data from historians and sensors without control rights unless your change process approves more.

  4. Each engineer gets only the access their task needs, logged and removed the day work ends.

  5. Changes are reviewed and tested off site first, then rolled out at a time agreed with operations.

  6. We build to IEC 62443 and ISO 45001 requirements where they apply and keep records your auditors can use. We do not certify.

Pricing

What mining software costs.

Ballpark: $18 to $34 an hour per engineer, about $2,900 to $5,400 a month full time. Every project is priced to your scope, with a written estimate before any work starts. Try the explorer to see what shapes your scope.

Sites covered
Data sources
Connectivity
Support needed
What shapes every estimateNumber of sitesSystems to connectConnectivity at siteSafety and OT reviewHardware and devicesSupport after rollout

Comparisons

Choosing the right mining software approach.

Pick a decision to see both options side by side, and when each one makes sense.

Off the shelf product

A packaged mining or maintenance system.

Choose this when
  • Your process matches the product
  • You want vendor support for years
  • Few links to other systems are needed
vs

Custom software

Built around how your sites really work.

Choose this when
  • Your process gives you an edge
  • Several systems must share data
  • Packaged tools leave big gaps

Single site pilot

Prove the tool where conditions are known.

Choose this when
  • Results are not yet proven
  • Site teams need to shape the tool
vs

Wide rollout

Deploy across sites in one programme.

Choose this when
  • The tool is proven elsewhere
  • Group reporting needs one standard
  • Leadership has set a firm date

Process at the edge

Data handled on site before sending.

Choose this when
  • Connectivity is weak or costly
  • Alerts must work without the internet
vs

Process in the cloud

Data sent to a central platform.

Choose this when
  • Sites have reliable links
  • You need group wide views
  • Heavy analysis is involved

Read only

Software reads data from plant systems but cannot change them.

Choose this when
  • Safety and OT risk must stay low
  • The goal is reporting and insight
vs

Two way

Software can send setpoints or commands back.

Choose this when
  • A clear operational benefit is proven
  • Management of change has approved it
  • OT security has reviewed the design

In house team

Your own engineers who know every site.

Choose this when
  • You can hire and keep specialists
  • Work is steady all year
vs

Delivery partner

Experienced engineers on demand, with one accountable lead.

Choose this when
  • You need skills for a programme
  • Demand rises and falls
  • You want to start this quarter

Getting started

How to get started.

Six steps from first call to first release. Most engineers start within 72 business hours of a confirmed brief.

  1. 01Day 1

    Initial consultation

    A 30 minute call about your goals, your current setup and what is not working.

  2. 02Days 2 to 4

    Requirement assessment

    We review what you have today and what you need, with read only access where useful.

  3. 03Week 1

    Technical discussion

    Our specialists walk your team through what we found and the options.

  4. 04Week 1 to 2

    Proposal and agreement

    A written estimate priced to your scope, plus the NDA and contract.

  5. 05Within 72 business hours

    Team selection

    You see profiles, interview the people and approve who joins.

  6. 06Kickoff

    Project kickoff

    Access, tools and a first milestone agreed, then work starts.

Client reviews

What every client gets in writing.

What clients say about working with our engineers, plus the terms that come with every engagement.

Youinterview every engineer
NDAbefore you share details
Yourscode and IP, by contract
Nofixed term, end with notice
Outsourcing our SEO to Javixor Labs was the best decision we made this year. Their team feels like a true extension of our in-house marketing department.
J
JadCobra Clicks

Read our reviews on Clutch

Questions

Mining and Metals software, answered.

What buyers ask before a first call.

What mining software do you build?+

Fleet and equipment tracking, HSE apps for incidents, inspections and permits, maintenance planning, production reporting, plant and sensor data platforms, geospatial tools, offline field apps, ESG reporting and ERP links. You can take one tool for one site or a programme across many sites.

How much does mining software cost?+

Ballpark: $18 to $34 an hour per engineer, about $2,900 to $5,400 a month full time. Cost depends on the number of sites, the systems to connect, connectivity at site, safety and OT review needs, and support after rollout. Every project is priced to your scope, with a written estimate before any work starts. These are ballpark figures. Your final cost is confirmed after the proposal discussion. Try the cost calculator.

How long does a mining software project take?+

A focused pilot at one site can show results within a few months. Multisite rollouts take longer because each site has its own systems, people and conditions. We agree milestones up front and deliver the most useful part first, so value arrives early.

Do field apps work without signal?+

Yes. Field apps store data on the device and sync when a connection returns. Crews can complete inspections, record incidents and take photos underground or in remote pits, and supervisors see the records once the device reconnects.

Do you control equipment or plant systems?+

By default we read data only. Any control function, such as sending setpoints, is designed with your operations and OT teams and goes through your management of change process. Safety systems are never touched without your explicit approval.

How do you protect our OT networks?+

We work with your OT team to keep plant networks separate, use approved one way data paths where possible and give each engineer only the access their task needs. We build to IEC 62443 requirements where they apply, and your teams keep sign off.

Can you help with ESG reporting?+

Yes. We build tools that collect emissions, energy, water and safety data from operations and prepare it for the frameworks you report against. Your sustainability and compliance teams decide on methods and sign off results. We build the data flows, we do not certify reports.

Can you work with our existing systems?+

Yes. We connect to historians, fleet systems, maintenance tools, ERP and GIS through their APIs or data exports. We start by mapping what you already have, so new software fills gaps rather than adding another silo.

Who owns the software and data?+

You do. Code lives in your repositories, data stays in your systems or cloud accounts, and the contract assigns all intellectual property to you. Geology, production and safety data is never reused for anyone else.

Can you work across our time zones and sites?+

Yes. Our engineers work from India and agree overlap hours with your site and head office teams. We work with clients across the US, UK, UAE and Europe whose sites may be elsewhere, and plan releases around shift patterns and site schedules.

What support do you offer after rollout?+

You can keep a monthly care plan for fixes, updates and small changes, with response times agreed in writing. Or we hand everything over to your team with documents, training for site staff and runbooks for the most common issues.

How do we start?+

Book a call or send a short brief describing the site problem you want to solve. A delivery lead replies within one working day, asks about your sites, systems and safety rules, then follows up with a scope and a written estimate.

Before you choose a provider

Additional considerations before you build.

What mining and metals teams usually want to know before starting a software project. It covers what makes mining different, how to handle remote sites and plant networks safely, where to start with fleet, maintenance and production data, and how to roll out across sites without disrupting operations.

Chapter 01

What makes software for mining different from other industries?

Short answer

Mines are hazardous, remote and run around the clock. Software has to support safe work, cope with weak connectivity, connect to plant systems without adding risk, and fit shift patterns that never stop.

Most business software lives in offices with fast internet and forgiving users. Mining software lives on haul roads, in pits, underground and in processing plants. The people using it wear gloves, work long shifts and have far more important things on their minds than a confusing screen.

Constraints that shape every project

  • Safety. Software supports hazardous work, so mistakes in data or design can have real consequences.
  • Remote locations. Sites may be hours from the nearest town, with limited signal and few IT staff on hand.
  • Plant systems. Crushers, mills and conveyors run on control systems that must not be disturbed.
  • Continuous operation. There is rarely a quiet time for updates, so rollouts must fit around shifts.
  • Many systems. Fleet, maintenance, lab, plant and finance tools often come from different vendors.

Good mining software accepts these limits from the start. It is simple to use in the field, works offline, reads plant data safely and is rolled out with the people who will use it, not just handed to them.

We also ask early who will look after the system on site once it is live, because that answer shapes how simple the setup needs to be.

Chapter 02

How does software support safety without adding new risk?

Short answer

Software can make safety work faster and more visible, from incident reports to permits and inspections. It must be designed with your HSE team, stay simple in the field, and never interfere with safety systems on site.

Safety records are often the first thing mining teams want to move off paper. Paper forms get lost, typed up late or filled in after the fact. Digital tools can capture records at the point of work and show trends that are hard to see in a filing cabinet.

Common safety tools

  • Incident and near miss reports with photos, location and follow up actions.
  • Inspections and checklists for equipment, areas and pre start checks.
  • Permits to work with approvals, isolation steps and sign off.
  • Trend dashboards showing where hazards cluster and which actions are overdue.

Guardrails we follow

  • Your HSE team defines the forms, the workflow and who signs off.
  • Software supports your safety management system, such as one aligned with ISO 45001. It does not replace it.
  • Safety instrumented systems and control functions stay outside the scope unless your engineers explicitly approve otherwise.
  • Field screens are kept short and clear, so they do not distract people doing hazardous work.
Chapter 03

How do you build apps that work at remote sites with poor signal?

Short answer

Design for offline first. Store data on the device, sync when a connection returns, keep files small and handle conflicts clearly. Test in real site conditions, not only in an office.

Many apps assume a constant connection. At a mine, that assumption breaks fast. Signal can drop underground, in deep pits or across large leases. An app that freezes without internet will soon be abandoned for paper again.

Offline first design

  • Local storage. Forms, photos and readings are saved on the device straight away.
  • Background sync. Data uploads quietly when a connection appears, with clear signs of what has and has not been sent.
  • Conflict rules. If two people edit the same record offline, the app knows how to resolve it or asks a supervisor.
  • Light data. Photos are compressed and reference data is kept small, so syncing works on weak links.
  • Rugged devices. Large buttons and clear contrast for gloves, dust and bright sunlight.

Site networks can help too. Some operations run private wireless networks or edge servers on site, so devices sync locally even when the link to head office is down. We plan the app around whatever your sites have today and what you expect to add.

Rule of thumb

If a supervisor cannot complete a full inspection in airplane mode, the app is not ready for site.

Chapter 04

How do you connect to plant systems without putting operations at risk?

Short answer

Read data through approved, one way paths, keep plant networks separate from business networks, and route any change through management of change. Your OT team should approve every connection.

Plant control systems run the equipment that crushes, grinds and moves ore. They were often designed long before modern cyber threats, and a careless connection can create risk. At the same time, the data inside them is exactly what production and maintenance teams need.

How we approach it

  • Read only by default. We collect data from historians and sensors without the ability to change anything.
  • Network separation. Plant and business networks stay apart, with data passing through approved zones.
  • One way paths. Where possible, data flows out of the plant network and nothing flows back in.
  • Least privilege. Each engineer and service gets only the access it needs, logged and reviewed.
  • Change control. Any new connection goes through your management of change process.

We build to the requirements of IEC 62443, the standard for industrial system security, where it applies. Your OT and security teams stay in charge of sign off. We do not certify systems, and we say so plainly.

Chapter 05

What can fleet and equipment tracking show you?

Short answer

Fleet tracking shows where trucks and loaders are, how long each cycle takes, how much time is spent idle or queuing, and how fuel is used. Small gains in cycle time add up over thousands of loads.

Haul trucks, loaders and support vehicles are among the largest costs at a mine. When a truck waits at a shovel or a crusher, it burns fuel and time without moving material. These delays are often invisible without data.

Useful views

  • Location and status. Where each unit is and whether it is loading, hauling, dumping, waiting or down.
  • Cycle times. How long each step takes, by route, shift and operator crew.
  • Queuing and idle time. Where trucks bunch up and why.
  • Fuel use. Consumption by unit and route, to spot waste or faults.
  • Utilisation. How much of the available time each machine is doing useful work.

Data can come from GPS units, onboard systems or an existing fleet management product. Where a fleet system is already in place, we usually connect to it rather than replace it, and add the reports or alerts it lacks. Hardware choices matter for remote sites, so we plan devices and connectivity together.

Start with one question the data should answer, such as why trucks queue at the crusher on night shift. A clear question keeps the first dashboard focused and gives supervisors a reason to open it. Once crews trust the numbers, add the next question rather than building every report at once.

Chapter 06

How can maintenance move from breakdowns to planned work?

Short answer

Start with your costliest equipment, collect condition data such as vibration, temperature and oil readings, link it to work orders, and act on warnings before failure. Predictive models come later, once the data is reliable.

Unplanned breakdowns on haul trucks, crushers or mills stop production and can create safety hazards. Planned maintenance on fixed schedules helps, but it can replace parts that still had life left, or miss failures that arrive early.

A practical path

  1. Pick the assets. Focus on the equipment whose failure costs the most in downtime or safety.
  2. Collect condition data. Vibration, temperature, pressure, oil analysis and operating hours.
  3. Set simple limits. Alert when readings cross agreed thresholds.
  4. Link to work orders. Warnings create tasks in your maintenance system with the data attached.
  5. Learn and refine. As history builds, add models that spot patterns before limits are reached.

AI can help with predictive maintenance, but only once data is clean and trusted. Many projects get the most value from the first four steps alone. Planners and maintenance supervisors should always review warnings before action is taken.

Chapter 07

How do you get production numbers in time to act on them?

Short answer

Pull tonnes, grades and plant data straight from source systems into one view, agree definitions across sites, and show it during the shift. Numbers that arrive at shift end can only explain what went wrong, not prevent it.

Many operations still build production reports by hand. Someone collects figures from the fleet system, the plant historian, the lab and a few spreadsheets, then puts them together after the shift. By then, any chance to correct course has passed.

What helps

  • Automatic data collection from fleet, plant, lab and weighbridge systems.
  • Shared definitions. Every site agrees what counts as a tonne moved, a delay or a shift target.
  • Live dashboards for supervisors during the shift, not only managers the next day.
  • Reconciliation. Checks between mine, plant and stockpile figures to find gaps early.
  • Links to finance. Production feeding ERP, so cost per tonne is based on real data.

Geospatial data adds another layer. Drone surveys can measure stockpile volumes and pit progress, and GIS tools can show these alongside plans. The aim is one trusted picture that both the site and head office use.

Chapter 08

How should mining companies handle ESG and carbon data?

Short answer

Capture energy, emissions, water and safety data inside operations systems, with a clear trail back to the source. Data collected by hand at reporting time is slow, hard to check and difficult to defend.

Investors, buyers and regulators ask more and more for site level environmental and social data. EU rules on carbon in imported metals, such as CBAM, mean some buyers now need embedded emissions figures from their suppliers. Expectations vary by market and change over time.

Building a reliable ESG data flow

  • Collect at source. Energy meters, fuel systems, water meters and safety apps feed data directly.
  • Keep the trail. Every reported figure can be traced back to the readings behind it.
  • Separate methods from data. Calculation methods set by your sustainability team are kept apart from raw data, so they can be updated cleanly.
  • Review and sign off. Your teams approve figures before they are published.

This is general information, not legal or regulatory advice. Check which rules apply to your business with your own advisers. We build the data tools; your compliance and sustainability teams decide what is reported and how.

Chapter 09

How do you roll out new software across sites without disrupting work?

Short answer

Start at one site, involve the crews and supervisors who will use it, train on shift, plan updates around operations and only expand once the first site is using it daily. Adoption matters more than features.

Many site systems fail not because the software is poor, but because people in the field were not part of shaping it. A tool designed in head office can feel like extra work on site.

  • Pick a pilot site. Choose one with a supportive site manager and a clear problem to solve.
  • Involve users early. Supervisors and crews test screens and workflows before launch.
  • Train on shift. Short sessions at pre start meetings work better than long classroom training.
  • Plan release windows. Updates go out at times agreed with operations, never in the middle of critical work.
  • Measure use. Track how many records are created in the app compared with paper.
  • Expand carefully. Adapt to each new site's equipment and practices rather than forcing one template.

Our engineers work from India and agree overlap hours with your site and head office teams. Where a project benefits from someone on site, a visit can be planned under your site induction and safety rules.

Chapter 10

What should you ask a mining software partner before you sign?

Short answer

Ask how they handle safety, OT security and offline use, who will do the work, how data and code are owned, and how they roll out across sites. A good partner is plain about what software can and cannot fix.

  1. How will you involve our HSE and operations teams in the design?
  2. Will you read plant data only, and how is any control function approved?
  3. How do your apps behave with no signal, and have you tested in conditions like ours?
  4. Who exactly will work on our systems, and can we interview them first?
  5. Will code and data live in our accounts, with IP assigned to us?
  6. How will you roll out across sites, and what support follows?
  7. What will you tell us if software is not the right fix?

At Javixor Labs every project is priced to your scope, with a written estimate before any work starts. Most engineers start within 72 business hours of a confirmed brief, and if someone is not a fit we send a replacement shortlist in 48 hours. If you need people who work with devices and sensors, you can also hire firmware engineers for your own team.

Production that is safer and steadier.

Tell us what you need. A delivery lead replies within one working day with next steps and a plan.

Or email sales@javixorlabs.com
Request a matchDevelopers